Showing posts with label bathroom. Show all posts
Showing posts with label bathroom. Show all posts

Monday, September 15, 2008

The door that didn't fit

It has been a while, I know. Sometimes life gets hectic but I assure you, S-wood is always on my mind and I am always full of posts, just a matter of sitting down and writing them out!

It was a gloomy weekend up there weather-wise and it poured yesterday but we still had a great time, great food, and great work time. It was also a “no kid” weekend which basically means that the children are at their dad’s for the weekend so we were all alone and able to work at our own pace and not worry about other people. Dave and I are usually pretty in tune that way and work pretty straight.

Bathroom: Dave finished installing the vent pipe to the roof (of course he had to paint it so it wouldn’t stick out) but I didn’t get any pictures of it. We have still not been able to get the rest of the wood for the top of the bathroom walls. We have the wainscoting but we are waiting for the rough sawn top halves so I can paint them all at one time. We did however get a door… well actually w had a door for the bathroom, we just hadn’t installed it. We had to make a few “modifications” (we cut it we cut it) but eventually we got ‘er up and now we have some privacy with our new indoor plumbing. *I say some because we haven’t found the “used” doorknob yet. I would like to find 3 matching because right in that area are ALL 3 of our interior doorways and it wouldn’t stink to have them all match!


So here is the Before... where the door didnt fit...
















And here is Frankenstein checking out the first interior door of the house! (incidentally, he continued to go in and out of the bathroom for the rest of the freaking day)























And just for the sake of showing you where we are at, this is the bathroom (wainscoting piled on the floor)


Monday, September 1, 2008

A Sewage Masterpiece


Fantastic weather, wonderful company, good hard honest work and indooooor plumbing. What more can a girl ask for? I got up there late friday night, Django and I took an alternate route to cabin due to traffic so there wasnt enough time to do anything but eat and drink and get some shut eye but saturday the great indoor plumbing challenge began! The end result is pictured on the left.



















Remember, we dont have running water as of now because the well is something like 800 feet and we dont have enough solar power to run a pump. So for now we will fill the tank manually as shown in the next photo.
The good thing in all this, of course, is no longer having to do the walk of shame and endure the heat, cold and rain on our heads, nor do we have to walk back up the mountain to get to the house. The 4am potty run's and the coyote are now a thing of the past. You can imagine how excited we all are.

Tarynn sanded the wainscoting and I painted all of the wood while dave plumbed the entire kit and kaboodle. He does not have a plumbers license, nor has he ever plumbed before but he does have a best friend with one to whom we have been sending photographic evidence and getting advice from. He did a fabulous job and it looks and works wonderfully!

It has been a long 3 years my friends and things just got considerably better!

Tuesday, August 26, 2008

Big Happenings

So much great stuff to update!
We left saturday for cabin, just got back today. We needed some time up there to get some stuff done so we took a few days off from work in order to do it. We arrived and went right to the lumber yard and got some rough saw wood for the bathroom. We had gotten the wainscoting months ago and just needed the top half of the walls in order to continue. I had this vision in my head of white wainscoting and white washed blue tops to the walls, thats why the tub is painted that color! SO we woke up early on sunday for this very reason. We put the kids to work, tarynn spent all day (i mean aaaaalll day) sanding the wainscoting and i primed them. Then I went out in the yard (I use that term loosely as there really is no yard at this point), watered down the paint and started to paint the top halves while dave STARTED THE PLUMBING for the bathroom. By the end of the first day we had roughly piped the toilet, and hung one wall of both top and bottom of the walls.


My yard set up for painting and drying.


























The finished product... ok well not finished, I have to still put the finish white paint on the wainscoting and we still have 2 more walls to do (the outside walls) but we have a space now, that is enclosed! Its our first "ROOM" at the cabin and let me tell you... its an important room! Oh imaging using the facilities INDOORS!
Dave and I really worked well together this weekend and had fun doing it. you can see on the top of the blue boards that we used antique nails for the look.

I am covered in blisters and we still have to put up baseboard and the chair rail (and 2 more walls worth) but really excited because once we finished the plumbing, we can pee indoors while we are working on the bathroom! LOL... ok not at the same time but you are following me here. Course, we have to find a door now...

Friday, May 30, 2008

Interior Progress- Bathroom

















Dave and I set out early this morning to install the laminate flooring that we scored at Lowes. It is recycled from a damaged return from a customer that did not care about the material. The top boards were a mess but the boards in the bundle itself were gorgeous.

I let dave lay a few pieces while I dusted off my camera. He did the cut and I laid the floor. We were a great team and accomplished it in only a few hours.




We moved all the really heavy furniture back in the room and I took a picture. Remember, most of this furniture was recycled from the dump or craigslist!




The next day after some sleep, I set off to painting the bathtub. Dave and I stripped and spray painted the feet the day before (not 100% sold on the feet color but the sink is copper).
This is our finished product:













Tomorrow we leave for the cabin again. Along with wrangling danes we hope to start some plumbing. We have done some ebay shopping over the last week and acquired ourselves a faucet. I had an opportunity for a tub faucet too but we kind of forgot to measure the fixture space so I dont want to getthem and have it not fit.

We also snagged ourselves some ceiling fans for the upstairs loft area. So once we get those in, i will of course post pictures!